Rahmansyah, Muhammad Reayhan, and Ardhini Warih Utami. “Rancang Bangun Sistem Informasi Penjadwalan Preventive Maintenance Untuk Meminimalisir Downtime Mesin Produksi Menggunakan Algoritma SJF: Preventive Maintenance Scheduling Information System Design to Minimize Production Machine Downtime Using the SJF Algorithm”. Journal of Emerging Information Systems and Business Intelligence (JEISBI) 5, no. 3 (July 2, 2024): 83–89. Accessed November 8, 2025. https://ejournal.unesa.ac.id/index.php/JEISBI/article/view/61600.