THE INTEGRATION OF CONSTRUCTION DRAWINGS FOR DAM PROJECT USING 5D BIM
Case Study of the Bagong Dam Construction Project, Trenggalek Regency
DOI:
https://doi.org/10.26740/rekats.v13n01.p56-60Keywords:
Dam, Building Information Modeling , 5D BIMAbstract
From Q4 2021 to Q3 2023, Indonesia recorded significant economic growth, with the construction sector contributing 9.8% to the Gross Domestic Product (GDP) of Indonesia. This study applies Building Information Modeling (BIM) in the Bagong Dam project with the aim of improving efficiency in construction sector. This study implemented 3D BIM for structural design modeling, along with 4D and 5D BIM for schedule integration and cost estimation on the Bagong Dam project in Trenggalek Regency. The methodology combines literature review and BIM implementation using Autodesk Revit and Navisworks Manage. Initially, a 3D model was created to calculate material volumes for each work package, then integrated with scheduling and cost estimation using Navisworks.
The analysis shows Autodesk Revit’s advantage in producing accurate material volume calculations, with a volume difference of 7.01% or 254,739.66 m³ for the main dam and only a 0.03% difference for the diversion tunnel concrete. The 4D and 5D simulations in Navisworks suggest the project appears 100% complete; however, contract data shows actual progress differs, with tasks like dam embankment and spillway still in early stages. This study demonstrates that BIM integration improves coordination efficiency but must align with field progress for more accurate cost and schedule estimates.
Downloads
References
Bayu, R. (2023). Informasi APBN 2023. Jakarta: Tim Kementerian Keuangan.
Hamrozi, M. N., & Adistana, G. A. (2022). Pengendalian Biaya dan Waktu dengan Metode Earned Value. REKATS.
IMF. (2023, October). WEO Data: October 2023 Edition. Diambil kembali dari International Monetary Fund: https://www.imf.org/en/Publications/WEO/weo-database/2023/October
Niam, N. W. (2022). Studi Alternatif Analisa Sedimentasi Terhadap Umur Bendungan Bagong Kabupaten Trenggalek Berbasis Arc Gis. Jurnal Rekayasa Sipil Vol. 12 No. 2, 90-98.
Nugrahini, P. (2020). Building Information Modeling (BIM) dalam Tahapan Desain dan Tahapan Desain dan Konstruksi di Indonesia, Peluang Dan Tantangan : Studi Kasus Perluasan T1 Bandara Juanda Surabaya. AGREGAT, 459-467.
Pantiga, S. (2021). Kajian Implementasi Building Information Modeling (BIM) di Dunia Konstruksi Indonesia. Rekayasa Sipil, 104-110.
Pradana, P., & Halimah. (2023). Pengaplikasian BIM 5D untuk Pekerjaan Arsitektur Pada Proyek Gedung IGD RSUD Waras Wiris Boyolali. Jurnal Riset Rekayasa Sipil, 20-27.
Prasetiawan, M. A. (2021). Perencanaan Bendungan di Dusun Sendang Pakelan Desa Sambirejo Kecamatan Wirosari Kabupaten Grobongan. Journal of Civil Engineering and Infrastructure Technology , 32-41.
Raza, T. A. (2023). Potential Features of Building Information Modeling (BIM) for Application of Project Management Knowledge Areas in The Construction Industry. Heliyon 9, 1-18.
Ziwen L, Y. L. (2021). Transition from building information modeling (BIM) to integrated digital delivery (IDD) in sustainable building management: A knowledge discovery approach based review. Journal of Cleaner Production.