ANALYSIS OF TOWER CRANE PRODUCTIVITY AND OPERATING COSTS
A CASE STUDY OF THE GRAHA CAHAYA KUSUMA OFFICE PROJECT SURABAYA
DOI:
https://doi.org/10.26740/rekats.v14n2.p309-319Keywords:
Productivity, Operational Cost, Tower CraneAbstract
This study analyzes the productivity and operational costs of a tower crane used in the Graha Cahaya Kusuma Office Construction Project, Surabaya. The objectives are to determine the tower crane’s productivity both theoretically and based on field observations, to identify the factors influencing productivity, and to compare operational costs calculated using both approaches. This research employs a descriptive quantitative method, with data collected through observation, interviews, and documentation. The analyzed data includes cycle time, volume of lifted materials, equipment specifications, and operational costs consisting of fixed costs (depreciation, insurance, taxes) and variable costs (fuel, lubricants, maintenance, repairs, and operator wages). The result show that theorerical average productivity of the tower crane over 20 days of observation was 4961,90 kg/hour, while the actual productivity in the field was 4870,42 kg/hour. The findings indicate a discrepancy between theoretical and actual field productivity, influenced by equipment condition, site conditions, project management, and operator skills. The operational cost analysis also reveals differences between theoretical estimates and actual field values. The theoretical operational cost was IDR 408,290.00 per hour, while the actual cost recorded was IDR . 423,095.00 per hour.
Downloads
References
Alatas, I. M., Taufik, S., & Anggraeni, A. (2022). STUDI PERANCANGAN ULANG STRUKTUR ATAS MENGGUNAKAN BAJA KOMPOSIT GEDUNG BUSINESS CENTRE DI JAKARTA SELATAN. In Jurnal Teknik Sipil (Vol. 1).
Ahmad, I. A. (2018). Analisis Produktivitas dan Biaya Operasional Tower Crane pada Proyek Puncak Central Business District Surabaya. Rekayasa Teknik Sipil,2(1997), 1–12. https://tinyurl.com/3u4jzez8
Bestari, I. K. (2018). Analisis Sistem Tenaga dan Redesign Tower Crane Potain MD 900. Jurnal Teknik ITS, 7(1). https://doi.org/10.12962/j23373539.v7i1.29380
Dalem, P. C. A. (2023). Analisis Produktivitas Dan Efektivitas Penggunaan Tower Crane Pada Proyek Pembangunan Shelter Tsunami Di Kuta. Teknik Sipil Politeknik Negeri Bali, 19.
Dharmawan, F. (2020). Jenis Jenis Tower Crane Pada Proyek Konstruksi. 1–203.
Eric Hartono, P., Noviyanti, & Alifen, R. S. (2016). Program Perhitungan Efektivitas Waktu dan Biaya Pemakaian Tower Crane. Dimensi Pratama Teknik Sipil, 02(02), 1–9.
Febrianto, A. R., Wiranto, P., & Lukman, H. (2016). Produktivitas Tower Crane pada Bangunan Ttingka Tinggi (Studi Kasus Proyek Pembangunan Swiss Bel Inn Hotel Bogor). Teknik Sipil Universitas Pakuan, 1–10.
Lokita, P., Citra, P., Sihkawekas, G., Hidayat, A., & Yuniarto, R. (2016). Hammer Head Crane Pada Proyek High Rise Building Studi Kasus : Menara Astra Project , Jakarta. Jurnal Karya Teknik Sipil, 5(2), 116–127.
Muhammad Fahri. (2022). Analisis produktivitas dan biaya operasional tower crane dan mobile crane. Teknik Sipil Institut Teknologi Padang.
Pangestu, R. A., Utoyo, S., & Lydianingtias, D. (2021). Analisis Penggunaan Tower Crane Untuk Pekerjaan Struktur Pada Proyek One Signature Gallery Surabaya. Jurnal JOS-MRK,2(2),2734.https://doi.org/10.55404/jos-mrk.2021.02.02.27-34
Pranata, A. A. (2020). Analisis Pengoperasian Tower Crane Untuk Pekerjaan Pengecoran Struktur Kolom. Jurnal Ilmiah Desain Dan Konstruksi, 75–83.
PUPR, K. (2022). Permen PUPR No 1 Tahun 2022 tentang Pedoman Penyusuanan Perkiraan Biaya Pekerjaan Konstruksi Bidang
Pekerjaan Umum dan Perumahan Rakyat. Kementrian PUPR, 1–18.
Purwiyono, B. D. S. (2023). Analisis Pengaruh Penempatan Terhadap Produktivitas Pada Tower Crane Proyek Pembangunan Gedung Guest Hotel Nganjuk. Sondir, 7(1), 86–93. https://doi.org/10.36040/sondir.v7i1.5919
Putra, A. E. (2020). Efisiensi Produktivitas Waktu dan Biaya Alat Berat Tower Crane. Universitas Islam Indonesia Yogyakarta, 1(3), 96.
Simamora, B. (2022). Skala Likert, Bias Penggunaan dan Jalan Keluarnya. Jurnal Manajemen, 12(1), 84–93. https://doi.org/10.46806/jman.v12i1.978
Sofia, A. D. (2017). Analisis Produktivitas Tower Crane Pada Proyek Pembangunan Gedung Tunjungan Plaza 6 Surabaya. Rekayasa Teknik Sipil Vol., 1(1), 144–155.
Subagyo, G. wulandari, & Tjondro, R. (2021). Analisis Produkivitas Tower Crane(Studi Kasus Proyek Bintaro Jaya Xchange Tahap II, Tangerang Selatan). Indonesian Journal of Construction Engineering and Sustainable Development (Cesd), 4(2), 108–118.https://doi.org/10.25105/cesd.v4i2.12510
Surur, A. F., & Dani, H. (2024). Pengangkatan Baja WF sebagai Bekisting Baja di Basement 1 Zona 2. Viteks, 2(3), 6.
Tiyas, A. C. A., & Prasetyono, P. N. (2024). Perhitungan Waktu Siklus Tower Crane Untuk Pekerjaan Pengecoran Pada Proyek Konstruksi (Studi Kasus Gedung Pringgodigdo Surabaya). Viteks, 2(2), 25–31.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Jurnal Rekayasa Teknik Sipil

This work is licensed under a Creative Commons Attribution 4.0 International License.
Abstract views: 0
,
PDF Downloads: 0