RE-PLANNING OF THE SUPERSTRUCTURE OF THE WARREN STEEL TRUSS BRIDGE, NGADI BRIDGE, KEDIRI REGENCY
DOI:
https://doi.org/10.26740/rekats.v14n01.p0Keywords:
Steel Truss Bridge, LRFD Method, WF Steel Profile, Bolt ConnectionAbstract
Bridges are important elements in land transportation infrastructure that function to connect roads that are cut off due to natural obstacles including valleys, rivers, ravines, or lakes (Hadi and Leo, 2018). There are various types of bridges, one of which is a steel truss bridge. This bridge is built from a steel structure that is composed of a number of steel bars systematically connected to each other (Asiyanto in Yoga, 2022). The Ngadi Bridge is included in the prestressed concrete bridge which was then redesigned utilizing a steel truss bridge. This planning serves to eliminate the pillars in the middle of the span to prevent scour that can cause the bridge to collapse. The planning of the Ngadi Bridge uses the LRFD method with the help of the SAP2000 application programme. The results of the Ngadi Bridge planning are, the bridge uses WF 600.300.14.23 steel profiles for the transverse girders and frames, and WF 400.300.10.16 steel for the longitudinal girders and wind ties connected using A325 type bolt connections with a diameter of 30 mm.
Downloads
References
Akbar, Daryl Julian Muhammad. (2018). Modifikasi Perencanaan Jembatan Sipait Pekalongan Dengan Menggunakan Sistem Jembatan Busur Rangka Baja. (Skripsi Sarjana, Institut Teknologi Sepuluh Nopember).
Arifin, Jaenal., Helmy Purwanto., & Imam Syafa’at. (2017). “Pengaruh Jenis Elektroda Terhadap Sifat Mekanik Hasil Pengelasan SMAW Baja ASTM A36”. Vol 13 (1): hal. 27-31.
Atika, Endah. 2018. Analisis Variasi Tinggi Rangka Batang Pada Jembatan Rangka Baja Tipe Pratt. (Skripsi Sarjana, Universitas Islam Indonesia).
Azka, Cut Nawalul. 2015. Perhitungan Slab Lantai Jembatan Srandakan Kulon Progo D. I. Yogyakarta. Diakses pada tanggal 13 Juni 2023, dari Struktur Jembatan (Slideshare.Net).
Benyamin, Putu Axel., Jonie Tanijaya., & Benny Kusuma. (2022). “Perencanaan Struktur Cantilever Bentang Panjang Menggunakan Rangka Pratt Truss”. Jurnal Teknik Sipil UKIPaulus-Makassar. Vol. 4 (1): hal. 61-70.
Fitriyaningrum, Arundyna Putri. 2024. Perencanaan Ulang Struktur Jembatan dengan Metode Cast In-Situ (Studi Kasus: Proyek Jalan Lintas Selatan LOT 6. (Skripsi Sarjana, Universitas Negeri Surabaya).
Hakikie, Prasetyo Nur. 2017. Perencanaan Ulang Jembatan Lemah Ireng II Pada Jalan Tol Semarang-Bawen Menggunakan Jembatan Busur Rangka Baja. (Skripsi Sarjana, Institut Teknologi Sepuluh Nopember).
Hadi, Nicholas & Edison Leo. (2018). “Analisis Perbandingan Perkuatan Jembatan Rangka Baja Dengan Metode Prategang Eksternal Ditinjau Dari Bentuk Trase Kabel Prategang”. Jurnal Mitra Teknik Sipil. Vol. 1 (1): hal. 230-239.
Mahardhika, Bintang. (2017). Perencanaan Modifikasi Rangka Busur Baja Pada Jembatan Pemali Dengan Damper Sebagai Longitudinal Stopper. (Skripsi Sarjana, Institut Teknik Sepuluh Nopember).
Yoga, Muhammad. (2022). Perencanaan Jembatan Kedungjati Menggunakan Struktur Atas Rangka Baja Tipe Warren. (Skripsi Sarjana, Universitas Islam Indonesia).
Abstract views: 10