GEOMETRIC REDESIGN OF THE PROBOLINGGO – BANYUWANGI TOLL ROAD PACKAGE 3 AT STA 27+000 – STA 32+000 USING THE AASHTO 2018 METHOD

Authors

  • Nurma Ayu Hastuti Universitas Negeri Surabaya

DOI:

https://doi.org/10.26740/rekats.v14n2.p333-342

Keywords:

Probolinggo – Banyuwangi Toll Road Package 3, Multicriteria Analysis, Road Geometries, Excavation and Embankment Volume

Abstract

The implementation of toll road construction often encounters various technical problems. One of the problems is the large-scale excavation and embankment activities, therefore this study creates several alternative routes which will then be subjected to multi-criteria analysis. Alternative routes are selected from several criteria, which will then be subjected to geometric calculations of the road and the volume of excavation and embankment. This study uses the 2018 AASHTO guidelines to plan alternative routes. The results of the geometric calculations of the road produce speeds of 100 km/h and 80 km/h with a radius of 300 to 400 m. The planned horizontal curves are of the S-C-S type as many as 5 pieces, while the vertical curves consist of 3 convex and 2 concave. Based on the calculation of the volume of excavation and embankment of the planned route, the excavation was obtained at 1,043,842.09 m3 and the embankment at 970,672.38 m3 with a ratio of 1075: 1000 approaching the ideal result of 1: 1, while the existing route obtained an excavation of 2,482,003.46 m3 and an embankment of 338,273.67 m3 with a ratio of 7337: 1000 which indicates an imbalance.

Downloads

Download data is not yet available.

References

AASHTO. (2018). A Policy on Geometric Design of Highways and Streets: The Green Book. In American Association of State Highway and Transportation Officials. www.transportation.org

Alijoyo, A., Wijaya, B., & Jacob, I. (2021). Multi-criteria Decision Analysis Analisis Keputusan Multikriteria. CRMS Indonesia.

Anita Theresia Kurniawati, & Misbahul Munir. (2017). Analytic Hierarchy Process (Ahp) Untuk Penentuan Rangking Penggunaan Lahan. Journal of Research and Technology, 3(1), 54–62. https://doi.org/10.55732/jrt.v3i1.811

Ariyanto, A. S. (2021). Pemanfatan Perangkat Lunak Autocad Civil 3D V. 2019 Sebagai Alat Bantu Perencanaan Grading. Bangun Rekaprima, 7(2), 71. https://doi.org/10.32497/bangunrekaprima.v7i2.2999

Erianda, R., Alvisyahrin, T., & Rusdi, M. (2022). Proses Cut and Fill Pada Lahan Berlereng Menggunakan Data Spasial Pada Lembah Barbate (Cut and Fill Process on Sloping Land Using Spatial Data In The Barbate Valley). Jurnal Ilmiah Mahasiswa Pertanian, 7, 712–716. www.jim.unsyiah.ac.id/JFP

Lutfie, M. (2024). Geometrik Jalan. Tahta Media Griup.

Pahrul Rodji, A., Indriasari, & Handoyo, D. M. (2023). Analisis Geometrik Jalan Pada Enam Ruas Jalan Tol Dalam Kota Jakarta Seksi a Kelapa Gading – Pulo Gebang. Jurnal Sipil Krisna, 9(1), 1–9. https://doi.org/10.61488/sipilkrisna.v9i1.255

Saputri, A., Aji, G., & Nasrullah, M. (2022). Dampak Ekternalitas Pembangunan Jalan Exit Tol Pekalongan - Batang terhadap Kondisi Ekonomi Masyarakat Sekitar. Jurnal Sahmiyah, 1(Dampak pembangunan Eksternal Jalan Exit Tol Pekalongan-Batang Terhadap Kondisi Ekonomi Masyarakat Sekitar (Pasar Grosir Setono)), 80–87.

Soeparyanto, T. S., Santi, Statiswaty, & Prasetia, M. S. (2023). Pengembangan Jaringan Jalan Kota Kendari Berbasis Multi Criteria Decision Making. Jurnal Ilmiah Teknik Sipil, 27(2), 1 9. http://dx.doi.org/10.1016/j.bpj.2015.06.056%0Ahttps://aca demic.oup.com/bioinformatics/article abstract/34/13/2201/4852827%0Ainternal pdf://semisupervised 3254828305/semisupervised.ppt%0Ahttp://dx.doi.org/10.1 016/j.str.2013.02.005%0Ahttp://dx.doi.org/10.10.

Undang-Undang Republik Indonesia Nomor 38 Tahun 2004 Tentang Jalan, Pub. L. No. 38, 30 2 (2004). https://jdih.pu.go.id/internal/assets/assets/produk/UU/ 2014/10/UU38-2004.pdf

Downloads

Published

2026-07-01

Issue

Section

Articles
Abstract views: 0 , PDF Downloads: 0