IMPLEMENTASI PROGRAM KOTA TANPA KUMUH (KOTAKU) DI DINAS PEKERJAAN UMUM DAN PERMUKIMAN RAKYAT (PUPR) KABUPATEN SIDOARJO

  • Novellita Myrsa Puspatiara Putri S1 Ilmu Administrasi Negara, Fakultas Ilmu Sosial dan Hukum, Universitas Negeri Surabaya
  • Suci Megawati S1 Ilmu Administrasi Negara, Fakultas Ilmu Sosial dan Hukum, Universitas Negeri Surabaya
Keywords: Implementation, Slum Area, Kotaku Program

Abstract

Having a healthy environment is everyone's right. In this case, the state is also responsible for this. However, slum areas are still a social problem that has not yet been resolved. It is recorded that in 2021, Sidoarjo Regency has 276.26 hectares of slum areas spread over 52 villages. In response to this, the Public Housing and Settlement Service Office of Sidoarjo Regency implemented the Slum-Free City Program in tackling slum areas. The Kotaku Program is a community-based infrastructure repair activity program whose main goal is to tackle slum areas. The purpose of this study is to see how the implementation and results of the Kotaku Program at the PUPR Office of Sidaorjo Regency are. The theory used in this study uses the public policy implementation model by Mulyadi (2015:12). This research approach uses a qualitative descriptive approach that will be carried out in Sidoarjo Regency. The result of this research is that the implementation of the Kotaku Program carried out by the PUPR Service has gone quite well by fulfilling every stage starting from the preparation stage, implementation stage, and completion stage. It was recorded that in 2021, 19 of the 52 villages targeted to become slum areas have been overcome and can reduce flooding and reduce slum areas in Sidoarjo Regency. This program can also help overcome unemployment due to the impact of Covid-19 by increasing the income of people who are heads of families who have lost their jobs so that it can reduce the unemployment rate that previously soared in Sidoarjo Regency. In addition, the implementation of this program will also carry out gradual evaluation monitoring both from activities and from implementing agencies so that in the future it becomes an effort to improve policies that are better and optimal.

References

Aziz, M. I. A. (2019). Implementasi Kebijakan Kartu Indonesia Sehat di Kecamatan Seberang Ulu I Kota Palembang. 1–110.

Fanida, E. H., Niswah, F., Megawati, S., & Rahaju, T. (2020). Improving the Community Economy in the New Normal Era Through the Application of Rebahan. Atlantis Press, 491(Advances in Social Science, Education and Humanities Research,), 1166–1171.

Handika, V., & Yusran, R. (2020). Implementasi Program Kotaku dalam Upaya Mengatasi Pemukiman Kumuh di Kabupaten Lima Puluh Kota. Journal of Civic Education, 3(3), 277–286.

Ilmu, S., Negara, A., Publik, J. A., Ilmu, F., Ilmu, S., Negara, A., Publik, J. A., & Ilmu, F. (2011). Implementasi Program Jampersal .......... IMPLEMENTASI PROGRAM JAMPERSAL ( JAMINAN PERSALINAN ) DALAM MENJAMIN PERSALINAN IBU DAN ANAK DI PROVINSI JAWA TIMUR Sarimatus Fadilah Badrudin Kurniawan. 419–432.

Jawa Pos. (2021). Pengangguran di Sidoarjo 10,9 Persen, Masih Tertinggi di Jawa Timur. Diakes Pada Sabtu, 20 Maret 2021

Kementrian PUPR. (n.d.). Surat Edaran Nomor 40/SE/DC/2016 Tentang Pedoman Kota Tanpa Kumuh.

Kementrian PUPR. (2016). kotaku.go.id. Diakes Pada Kamis, 9 April 2021

Kementrian PUPR. (2020). Program Kota Tanpa Kumuh.

Kementrian PUPR. (2021). Prosedur Operasional Standar Penyelenggaraan Kota Tanpa Kumuh (p. 70).

Kompas. (2021). Jokowi Minta Kepala Daerah Perbanyak Program Padat Karya. Diakes Pada Sabtu, 20 Maret 2021

Nofriandi, R. (2017). Implementasi Peraturan Walikota Langsa Nomor REG.800/I/I/227/2016 Tentang Pemberlakuan Absensi Elektronik (E-Disiplin) di Lingkungan Sekretariat Daerah Kota Langsa. 9–44.

Nur Bakhtiar, A., & Qodir, Z. (2015). Implementasi Program Keluarga Harapan Sebagai Upaya Penanggulangan Kemiskinan di Kecamatan Berbah Sleman Tahun 2013. Journal of Governance and Public Policy, 2(2).

Nuraisah, N., & Wahyuni, L. (2020). Implementation of Public Service Principles at Sabak Auh Sub-district Head Office in Siak Regency. Jurnal Administrasi Publik : Public Administration Journal, 10(1), 74–82. Onainor, E. R. (2019). 済無No Title No Title No Title. 1(9), 105–112.

Pemerintah Kabupaten Sidoarjo. (2021). SK Bupati No. 188/311/438.1.1.3/2021 Tentang Lokasi Perumahan Kumuh dan Permukiman Kumuh Di Kabupaten Sidoarjo.

Pinayungan, J., Kusmanto, H., & Isnaini, I. (2018). Implementasi Peraturan Menteri Perhubungan Republik Indonesia Tentang Standar Keselamatan Lalu Lintas Dan Angkutan Jalan. Jurnal Administrasi Publik : Public Administration Journal, 8(1), 108.

Qonita, C., Qonita, C. D., & Rahmawati, D. (2021). Strategi Penanganan Pemukiman Kumuh di Area Pendukung Industri Kelurahan Krian, Kabupaten Sidoarjo. Jurnal Teknik ITS, 9(2), C231–C238.

Wijaya, D. W. (2016). Perencanaan Penanganan Kawasan Permukiman Kumuh (Studi Penentuan Kawasan Prioritas untuk Peningkatan Kualitas Infrastruktur pada Kawasan Pemukiman Kumuh di Kota Malang). Jurnal Ilmiah Administrasi Publik, 2(1), 1–10.

Wijayanti, P., & Jannah, L. M. (2019). Implementasi Kebijakan Manfaat Jaminan Hari Tua di Indonesia. JPSI (Journal of Public Sector Innovations), 4(1), 20.
Published
2022-01-12
Section
Articles
Abstract Views: 419
PDF Downloads: 585