ANALISIS PRODUKTIVITAS ALAT BOR (BORE MACHINE) PADA PROSES PENGEBORAN PONDASI BORED PILE DI KOTA SURABAYA

  • MOHAMMAD DAVID EKO SAPUTRO

Abstract

Pelaksanaan suatu proyek konstruksi sering menunjuk perusahaaan kontraktor yang telah ditetapkan untuk merealisasikan pekerjaan di lapangan. Seperti pelaksanaan pekerjaan pondasi bored pile, di sub kontraktorkan kepada professional yang khusus menangani pondasi bored pile. Pelaksanaan pekerjaan bored pile disini menggunakan alat berat yaitu bore machine. Untuk menguji produktivitas alat berat pada proyek pembangunan di Surabaya, maka dapat dilakukan analisis produktivitas alat berat bored pile pada pekerjaan pengeboran pondasinya.

Penelitian ini dilaksanakan dengan metode observasi. Tujuan dilakukannya penelitian ini adalah sebagai berikut: Memberi pengetahuan pelaksanaan pengeboran pondasi bored pile menggunakan alat bor (bore machine), mengetahui produktivitas alat bor (bore machine) secara optimum pada pelaksanaan pengeboran pondasi bored pile di kota Surabaya dan mengestimasi lama waktu dan biaya yang diperlukan untuk pelaksanaan pengeboran menggunakan alat bor (bore machine).

Hasil penelitian adalah perbandingan waktu pelaksanaan pekerjaan pondasi bore pile yang pada pekerjaan pengeboran (drilling) maka waktu rata-rata yang diperlukan bore machine type Kobelco BM 500 sebesar 14.464 m/jam sedangkan waktu untuk bore machine type link belt LS 108 B-SS sebesar 16.423 m/jam. Biaya yang dibutuhkan bore pile untuk pekerjaan pondasi bore pile  adalah 30 hari kerja dengan biaya sebesar Rp. 1.586.576,37,-  /jam  (satu juta lima ratus delapan puluh enam ribu lima ratus tujuh puluh enam rupiah koma tiga puluh tujuh) untuk type Kobelco BM 500 sedangkan untuk type link belt LS 108 B-SS sebesar Rp. 917.455,87,- /jam (Sembilan ratus tujuh belas ribu empat ratus lima puluh lima rupiah koma delapan puluh tujuh).

Kata kunci : produktivitas, alat bor, pengeboran pondasi.

Implementation of a construction contractor firms often point set for realizing the work in the field . Such as the implementation of bored pile foundation work , in sub kontraktorkan to the professional who specializes in bored pile foundation . Implementation of bored pile work here using heavy equipment that bore machine . To test the productivity of heavy equipment on construction projects in Surabaya , it can do analysis machine productivity at work drilling bored pile foundation.

This research was conducted by the method of observation . The purpose of this study is as follows : the implementation Knowledge of bored pile foundation drilling using a drill (bore machine) , knowing productivity tool drill (bore machine) on the implementation of the optimum drilling bored pile foundation in the old city of Surabaya and estimate the time and cost required for the implementation of drilling using a drill (bore machine).

Results of the study is a comparison of the execution time of the bored pile foundation work on the job of drilling (drilling) the average time it takes bore machine type Kobelco BM 500 at 14,464 m / hour, while the time to bore machine type Link Belt LS - 108 B SS amounted to 16,423 m / hour . Then the cost is cheaper by using bore machine type Link Belt LS 108 B - SS . Costs required for the bored pile foundation work bored pile is 30 working days at a cost of Rp . 1,586,576.37 ,- / hour ( one million five hundred eighty- six thousand five hundred seventy- six point thirty seven dollars ) for Kobelco type BM 500 while for Link Belt LS 108 type - B SS amounted to Rp . 917,455.87 ,- / hour ( Nine hundred and seventeen thousand four hundred and fifty- five point eighty seven dollars).

Key word: productivity, bore machine, drilling foundation.